SCH Number 2008061106


Project Info

Title
521 Pacific Avenue Seawall Maintenance, Repair and Extension Project
Description
The Proposed Project would repair, maintain and extend an existing seawall below 521 Pacific Avenue. The Proposed Project is required by the terms of prior permits issued by the City and the California Coastal Commission (Coastal Commission or CCC) to repair and maintain the existing seawall and to remove existing riprap located on the public beach. Specially, the Proposed Project would: 1) Remove approximately 30 feet of previously permitted riprap that currently fronts the existing coastal structure at the base of the bluff below the subject property; 2) Maintain, repair, and extend the existing coastal structure northerly a distance of approximately fifty (50) feet; and 3) Maintain, rehabilitate, and extend the existing coastal structure vertically by four (4) feet and southerly by seven (7) feet.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Solana Beach 521 Pacific Avenue Seawall Maintenance, Repair and Extension Project
City of Solana Beach 521 Pacific Avenue Seawall Maintenance, Repair and Extension Project