521 Pacific Avenue Seawall Maintenance, Repair and Extension Project

2 Documents in Project

Summary

SCH Number
2008061106
Lead Agency
City of Solana Beach
Document Title
521 Pacific Avenue Seawall Maintenance, Repair and Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
11/14/2008
Present Land Use
Residential/Medium Residential (MR)/Medium Residential (MR)
Document Description
The Proposed Project would repair, maintain and extend an existing seawall below 521 Pacific Avenue. The Proposed Project is required by the terms of prior permits issued by the City and the California Coastal Commission (Coastal Commission or CCC) to repair and maintain the existing seawall and to remove existing riprap located on the public beach. Specially, the Proposed Project would: 1) Remove approximately 30 feet of previously permitted riprap that currently fronts the existing coastal structure at the base of the bluff below the subject property; 2) Maintain, repair, and extend the existing coastal structure northerly a distance of approximately fifty (50) feet; and 3) Maintain, rehabilitate, and extend the existing coastal structure vertically by four (4) feet and southerly by seven (7) feet.

Contact Information

Name
Tina Christiansen
Agency Name
City of Solana Beach Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Solana Beach
Counties
San Diego
Cross Streets
Pacific Avenue, Solano Vista Drive and Ocean Street
Zip
92075
Parcel #
263-041-04, 26
State Highways
Highway 101
Railways
Amtrak
Schools
Carmel Creek Elementary
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of Solana Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print