SCH Number 2008061087


Project Info

Title
Batiquitos Gravity Sewer
Description
The project is proposed by the Leucadia Wastewater Dist. to improve the reliability and efficiency of an existing 18-in. gravity sewer main by replacing it with a new 24-in. diameter PVC sewer main within Carlsbad Blvd./N. Coast HWY 101. The existing 18-in. diameter pipeline would be abandoned in place. The project includes all trench resurfacing and site restoration, including fencing and landscaping at the Batiquitos Pump Station, to return the project site to its original condition. Construction is proposed outside the bird-breeding season and it tentatively scheduled for Dec. 2008 through Feb. 2009, a period of approx. 12 weeks.