Mitigated Negative Declaration for the Leucadia Wastewater District Batiquitos Gravity Sewer Project

2 Documents in Project

Summary

SCH Number
2008061087
Lead Agency
Leucadia County Water District
Document Title
Mitigated Negative Declaration for the Leucadia Wastewater District Batiquitos Gravity Sewer Project
Document Type
NOD - Notice of Determination
Received
Posted
11/12/2008
Present Land Use
The project is entirely within the existing right-of-way of Carlsbad Boulevard/North Coast Highway 101 and the Batiquitos Pump Station.
Document Description
The project is proposed by the Leucadia Wastewater Dist. to improve the reliability and efficiency of an existing 18-in. gravity sewer main by replacing it with a new 24-in. diameter PVC sewer main within Carlsbad Blvd./N. Coast HWY 101. The existing 18-in. diameter pipeline would be abandoned in place. The project includes all trench resurfacing and site restoration, including fencing and landscaping at the Batiquitos Pump Station, to return the project site to its original condition. Construction is proposed outside the bird-breeding season and it tentatively scheduled for Dec. 2008 through Feb. 2009, a period of approx. 12 weeks.

Contact Information

Name
Robin Morishita
Agency Name
Leucadia Wastewater District
Contact Types
Lead/Public Agency

Location

Cities
Carlsbad
Counties
San Diego
Cross Streets
Carlsbad Boulevard and La Costa Avenue
Zip
92009
State Highways
I-5
Railways
San Diego Northern
Waterways
Batiquitos Lagoon and Pacific Ocean
Township
12S
Range
4W
Section
33
Base
SBB&M

Notice of Determination

Approving Agency
Leucadia Wastewater District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes