SCH Number 2008042043


Project Info

Title
Copper Cove Wastewater Treatment Plant, Phase 1 Expansion, Headworks & Surface Aerator Improvements
Description
The project will replace aging facilities and electrical systems and expand the average sewer treatment capacity from 0.25 to 0.50-mgd. The project will include: (1) new headworks including flow metering; lift station and solids screen; (b) new 12-inch x 800-feet pipeline (replacement) between aeration basins; (c) additional surface aerators as needed to increase treatment capacity to 0.50-mgd; (d) upgrade for electrical controls, instrumentation, computer and radio equipment; (e) new 12 foot by 30 foot masonry building for housing electrical equipment; and (f) upgrade PG&E service and install a standby/backup power diesel generator.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Calaveras County Water District (CCWD) Copper Cove Wastewater Treatment Plant, Phase 1 Expansion, Headworks & Surface Aerator Improvements
Calaveras County Water District (CCWD) Copper Cove Wastewater Treatment Plant, Phase 1 Expansion, Headworks & Surface Aerator Improvements