Copper Cove Wastewater Treatment Plant, Phase 1 Expansion, Headworks & Surface Aerator Improvements

2 Documents in Project

Summary

SCH Number
2008042043
Lead Agency
Calaveras County Water District (CCWD)
Document Title
Copper Cove Wastewater Treatment Plant, Phase 1 Expansion, Headworks & Surface Aerator Improvements
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2008
Present Land Use
Site is zoned Public Service and surrounding parcels are zoned Residential.
Document Description
The project will replace aging facilities and electrical systems and expand the average sewer treatment capacity from 0.25 to 0.50-mgd. The project will include: (1) new headworks including flow metering; lift station and solids screen; (b) new 12-inch x 800-feet pipeline (replacement) between aeration basins; (c) additional surface aerators as needed to increase treatment capacity to 0.50-mgd; (d) upgrade for electrical controls, instrumentation, computer and radio equipment; (e) new 12 foot by 30 foot masonry building for housing electrical equipment; and (f) upgrade PG&E service and install a standby/backup power diesel generator.

Contact Information

Name
Steve Hutchings
Agency Name
Calaveras County Water District
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Cross Streets
Little John Road and Kiva Drive
Zip
95228
Parcel #
065-032-001
State Highways
Route 4 (~ 4.5 miles)
Waterways
Littlejohns Creek (~ 1 mile)
Township
1N
Range
12E
Section
26
Base
MDB&M
Other Location Info
City/Nearest Community: Copperopolis, Copper Cove

Notice of Determination

Approving Agency
Calaveras County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print