SCH Number 2007121105


Project Info

Title
Barham Drive Widening Project (WITHDRAWN)
Description
The project corridor is from Woodland Parkway to Opper Street. The project limits include 4,100 feet within the City of San Marcos (Woodland Parkway to eastern City of San Marcos limits) and 1,200 feet within the City of Escondido (City of San Marcos/City of Escondido boundary to Opper Street). The Barham Drive Widening Project will be constructed in two phases: Phase IA will include the construction of a privacy replacement wall along the San Marcos Mobile Estates and Casitas del Sol mobile home parks, Phase IB will include widening Barham Drive east of Woodland Parkway to the SR-78 on-ramps, and Phase II will include widening of Barham Drive east of the SR-78 on-ramps to Opper Street. Phase IB and II will be constructed within the existing 84-foot right-of-way and within portions of City of San Marcos acquired parcels between Woodland Parkway on the west and Opper Street on the east.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of San Marcos Barham Drive Widening Project (WITHDRAWN)
City of San Marcos Barham Drive Widening Project (WITHDRAWN)