Barham Drive Widening Project (WITHDRAWN)

2 Documents in Project

Summary

SCH Number
2007121105
Lead Agency
San Marcos, City of (City of San Marcos)
Document Title
Barham Drive Widening Project (WITHDRAWN)
Document Type
NEG - Negative Declaration
Received
Present Land Use
The linear project site is located within a Residential (4-8 dwelling units per acre) land use designation (City of San Marcos General Plan, Barham/Discovery Neighborhood Adopted Plan, 1988). The City of San Marcos has zoned the roadway area as Residential (R-1), Residential Mobile Home Park (R-MHP), and Light Industrial (L-M). The project area is located within the Light Industrial designation of the Escondido zoning. The City of Escondido designates the portion fo Barham Drive as a Major Road with a 102 foot right-of-way.

Document Description
The project corridor is from Woodland Parkway to Opper Street. The project limits include 4,100 feet within the City of San Marcos (Woodland Parkway to eastern City of San Marcos limits) and 1,200 feet within the City of Escondido (City of San Marcos/City of Escondido boundary to Opper Street). The Barham Drive Widening Project will be constructed in two phases: Phase IA will include the construction of a privacy replacement wall along the San Marcos Mobile Estates and Casitas del Sol mobile home parks, Phase IB will include widening Barham Drive east of Woodland Parkway to the SR-78 on-ramps, and Phase II will include widening of Barham Drive east of the SR-78 on-ramps to Opper Street. Phase IB and II will be constructed within the existing 84-foot right-of-way and within portions of City of San Marcos acquired parcels between Woodland Parkway on the west and Opper Street on the east.

Contact Information
Susan Vandrew Rodriguez
City of San Marcos
1 Civic Center Drive
San Marcos, CA 92069

Phone : (760) 744-1050 ext. 3237

Location

Cities
San Marcos
Counties
San Diego
Cross Streets
Barham Drive, Woodland Parkway, and Opper Street
Zip
92069
Total Acres
0.12 (5,300 ft)
Parcel #
City Right-of-Way
State Highways
78
Railways
NCTD Railway
Schools
San Marcos USD

Notice of Completion

Review Period Start
Review Period End
Development Type
Transportation:Local Road (Road Widening)
Project Issues
Aesthetic/Visual Air Quality Archaeologic-Historic Drainage/Absorption Geologic/Seismic Noise Traffic/Circulation Vegetation Water Quality Wetland/Riparian Wildlife Land Use
Reviewing Agencies
Air Resources Board, Transportation Projects California Department of Fish and Wildlife, South Coast Region 5 California Department of Parks and Recreation California Department of Transportation, District 11 California Highway Patrol California Regional Water Quality Control Board, San Diego Region 9 Department of Water Resources Office of Historic Preservation Resources Agency California Native American Heritage Commission

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print