- Fillmore Santa Clara River Permeable Weirs
- Description
- The Ventura County Resources different locations on the north bank of the Santa Clara River. a single palisade structure consists of 3-11 steel will be 8 ft in height. The netting material will be 4 inches in width with a mesh size of 13.75-18.75 inches high by 21-23 inches wide. The palisades will be oriented at a 25 degree downstream angle and will range from 65-195 linear ft each. Each palisade structure will be buried with native material and a 4 ft thick surface layer of riprap. Ultimately, these structures will be buried below the streambed elevation or along the banks, which will be backfilled. Approximately 13 palisade structures will be installed adjacent to the Fillmore City wastewater treatment plant. Eight palisades will be installed at the Riverwalk Development, adjacent to the existing soil cement levee. Areas impacted by the installation will be planted with native riparian species and irrigated. The project will be phased, with the estimated palisade system installation at the Fillmore Wastewater Treatment Plant conducted in 2009, and the estimated palisade system installation at the Riverwalk development to follow in 2011.
2 documents in project