Santa Clara River Permeable Weirs

2 Documents in Project

Summary

SCH Number
2007121104
Lead Agency
City of Fillmore
Document Title
Santa Clara River Permeable Weirs
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2009
Document Description
The Ventura County Resources different locations on the north bank of the Santa Clara River. a single palisade structure consists of 3-11 steel will be 8 ft in height. The netting material will be 4 inches in width with a mesh size of 13.75-18.75 inches high by 21-23 inches wide. The palisades will be oriented at a 25 degree downstream angle and will range from 65-195 linear ft each. Each palisade structure will be buried with native material and a 4 ft thick surface layer of riprap. Ultimately, these structures will be buried below the streambed elevation or along the banks, which will be backfilled. Approximately 13 palisade structures will be installed adjacent to the Fillmore City wastewater treatment plant. Eight palisades will be installed at the Riverwalk Development, adjacent to the existing soil cement levee. Areas impacted by the installation will be planted with native riparian species and irrigated. The project will be phased, with the estimated palisade system installation at the Fillmore Wastewater Treatment Plant conducted in 2009, and the estimated palisade system installation at the Riverwalk development to follow in 2011.

Contact Information

Name
Jeff Humble
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Fillmore
Counties
Ventura
Cross Streets
River Street and State Route 23
Zip
93105
Total Acres
3
Parcel #
Various
State Highways
126, 23
Railways
Fillmore-Western
Schools
Fillmore High, San Cayetano ES, Sespe
Waterways
Santa Clara River, Sespe Creek
Township
4N
Range
19W
Section
31
Base
SBB&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.