SCH Number 2007101108
Project Info
- Title
- Main Campus Infrastructure Renewal Project
- Description
- The Santa Barbara Campus proposes to replace certain underground utility distribution and collection pipelines. A phased infrastructure renewal program has been developed that addresses the natural gas and potable water distribution systems, and the sanitary sewer collection and storm drainage systems. The utilities that would be replaced have been identified as being in deteriorated condition and/or undersized to adequately serve the existing development located on the Main Campus.
5 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
ADM | University of California, Santa Barbara | Main Campus Infrastructure Renewal Project | |
NOD | University of California, Santa Barbara | Main Campus Infrastructure Renewal Project Phase 1C | |
FIN | University of California, Santa Barbara | Main Campus Infrastructure Renewal Project | |
NOD | University of California, Santa Barbara | Main Campus Infrastructure Renewal Project | |
NEG | University of California, Santa Barbara | Main Campus Infrastructure Renewal Project |