SCH Number 2007101101
Project Info
- Title
- New Wells #13 and #14, Storage Tank, and Connecting Pipelines
- Description
- The project is the construction and operation of two new wells, a new pipeline, and an associated storage tank to offset the loss of water capacity due to arsenic contamination of Well #5. Surface structures related to each well included a pump assemble and fencing to enclose the pump area.
3 documents in project