SCH Number 2007021081


Project Info

Title
Water Supply Interconnection between Crescenta Valley Water District and the City of Los Angeles
Description
Phase 1 and 2 were rewarded funds under the Proposition 50 Program. Phase 1 consists of construction of a new transmission water main that will connect CVWD to an existing Los Angeles Department of Water and Power water main. Phase 2 consist of construction of new chlorination station and new transmission water main to allow water flow control to be improved from CVWD to Foothills Municipal Water District Berkshire Booster Station.The proposed project consists of the construction of a new transmission water main, which will connect to an existing Los Angeles Department of Water and Power (LADWP) 6" water main at a location near Honolulu Avenue, west of Lowell Avenue and east of the on-ramp to the 210 Freeway west. The new LADWP system will terminate at a new meter structure that will be located adjacent to CVWD's existing Ordunio Reservoir site. CVWD will install a new on-site water main that will connect to the LADWP meter. The CVWD water main will connect to the inlet/outlet pipeline for the Ordunio Reservoir. A new chloramination system (sodium hypochlorite/aqua ammonia) and a new chloramination building will also be constructed.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Crescenta Valley Water District (CVWD) Water Supply Interconnection between Crescenta Valley Water District and the City of Los Angeles
Crescenta Valley Water District (CVWD) Water Supply Interconnection between Crescenta Valley Water District and the City of Los Angeles
Crescenta Valley Water District (CVWD) Water Supply Interconnection between Crescenta Valley Water District and the City of Los Angeles