Water Supply Interconnection between Crescenta Valley Water District and the City of Los Angeles
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007021081
- Lead Agency
- Crescenta Valley Water District
- Document Title
- Water Supply Interconnection between Crescenta Valley Water District and the City of Los Angeles
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/24/2011
- Present Land Use
- Z: PF1-XL GP: Public Facilities Zone
- Document Description
- The proposed project consists of the construction of a new transmission water main, which will connect to an existing Los Angeles Department of Water and Power (LADWP) 6" water main at a location near Honolulu Avenue, west of Lowell Avenue and east of the on-ramp to the 210 Freeway west. The new LADWP system will terminate at a new meter structure that will be located adjacent to CVWD's existing Ordunio Reservoir site. CVWD will install a new on-site water main that will connect to the LADWP meter. The CVWD water main will connect to the inlet/outlet pipeline for the Ordunio Reservoir. A new chloramination system (sodium hypochlorite/aqua ammonia) and a new chloramination building will also be constructed.
- Contact Information
-
David S. Gould
Crescenta Valley Water District
2700 Foothill Boulevard
La Crescenta, CA 91214
Phone : (818) 248-3925
Location
- Counties
- Los Angeles
- Cross Streets
- Honolulu Avenue and Lowell Avenue
- Zip
- 91214
- Total Acres
- 0.025
- Parcel #
- 5607-014-905
- State Highways
- 210
- Schools
- Lincoln ES
- Waterways
- Verdugo Wash
- Other Location Info
- City/Nearest Community: La Crescenta/Tujunga
Notice of Determination
- Approving Agency
- Crescenta Valley Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- CVWD's Main Office 2700 Foothill Blvd La Crescenta, CA 91214
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.