Water Supply Interconnection between Crescenta Valley Water District and the City of Los Angeles

3 Documents in Project

Summary

SCH Number
2007021081
Lead Agency
Crescenta Valley Water District (CVWD)
Document Title
Water Supply Interconnection between Crescenta Valley Water District and the City of Los Angeles
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2011
Present Land Use
Z: PF1-XL GP: Public Facilities Zone
Document Description
The proposed project consists of the construction of a new transmission water main, which will connect to an existing Los Angeles Department of Water and Power (LADWP) 6" water main at a location near Honolulu Avenue, west of Lowell Avenue and east of the on-ramp to the 210 Freeway west. The new LADWP system will terminate at a new meter structure that will be located adjacent to CVWD's existing Ordunio Reservoir site. CVWD will install a new on-site water main that will connect to the LADWP meter. The CVWD water main will connect to the inlet/outlet pipeline for the Ordunio Reservoir. A new chloramination system (sodium hypochlorite/aqua ammonia) and a new chloramination building will also be constructed.

Contact Information

Name
David S. Gould
Agency Name
Crescenta Valley Water District
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Honolulu Avenue and Lowell Avenue
Zip
91214
Total Acres
0.025
Parcel #
5607-014-905
State Highways
210
Schools
Lincoln ES
Waterways
Verdugo Wash
Other Location Info
City/Nearest Community: La Crescenta/Tujunga

Notice of Determination

Approving Agency
Crescenta Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.