SCH Number 2007012107


Project Info

Title
Fremont Unified School District M.V.R.O.P. Campus at Kennedy High School
Description
The MVROP, with approval and oversight by the FUSD, is proposing to construct and operate the educational facility planned for grade levels 9 through 12, including adults with an enrollment capacity of 513 students, with a future Master Plan site capacity of 729 students. Construction and operation of the new MVROP facilities would be the responsibility of the FUSD. The construction of the project is currently underway and is expected to be completed in May 2007. The facilities would be located on the southern end of the existing Campus on Blacow Road and Stevenson Boulevard. The total interior building area would be 47,284 square feet (sf). Facility buildings would include 26,390 sf of teaching spaces (19 teaching stations), including classrooms, storage, and offices.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Fremont Unified School District Fremont Unified School District M.V.R.O.P. Campus at Kennedy High School
Fremont Unified School District Fremont Unified School District M.V.R.O.P. Campus at Kennedy High School