Fremont Unified School District M.V.R.O.P. Campus at Kennedy High School

2 Documents in Project

Summary

SCH Number
2007012107
Lead Agency
Fremont Unified School District
Document Title
Fremont Unified School District M.V.R.O.P. Campus at Kennedy High School
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2007
Present Land Use
GP: D (Downtown) Z: DC (Downtown Commercial)
Document Description
The MVROP, with approval and oversight by the FUSD, is proposing to construct and operate the educational facility planned for grade levels 9 through 12, including adults with an enrollment capacity of 513 students, with a future Master Plan site capacity of 729 students. Construction and operation of the new MVROP facilities would be the responsibility of the FUSD. The construction of the project is currently underway and is expected to be completed in May 2007. The facilities would be located on the southern end of the existing Campus on Blacow Road and Stevenson Boulevard. The total interior building area would be 47,284 square feet (sf). Facility buildings would include 26,390 sf of teaching spaces (19 teaching stations), including classrooms, storage, and offices.

Contact Information

Name
Therese Gain
Agency Name
Fremont Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Fremont
Counties
Alameda
Cross Streets
Stevenson Boulevard, Blacow Road
Zip
94538
State Highways
I-880
Railways
UPRR
Airports
San Jose International
Schools
Kennedy HS
Waterways
San Francisco Bay
Township
5S
Range
1W
Section
4

Notice of Determination

Approving Agency
Fremont Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print