SCH Number 2006102081


Project Info

Title
Brooktrails Rubber Spillway Dam Project
Description
The purpose of the proposed project is to restore the storage capacity lost (52 acre-feet) due to siltation at Lake Emily. Brooktrails proposed project would replace the existing wooden flashboards by installing inflatable gates, thereby increasing the maximum water level in Lake Emily by three feet. The spillway gate will be 48 feet wide and the structure will include a base slab, 15 foot high concrete cutoff walls, and airbladders to operate the steel gate panels. Installation would be done when the lake water level is eight feet below the spillway. The proposal includes the installation of berm at the dam toe and construction of a small dam control building. The dam would be reinforced at its southwest corner with the addition of an earthen berm to support the foundation and to increase the dam integrity. The berm will have a 225 foot long blanket drain that varies in elevation. Compacted earth and fill material from a borrow area adjacent to the dam will be used in constructing the berm. The earthen berm will fill in 0.04 acre of wetland located at the base of the dam. A 10 foot by 15 foot control building will be constructed near the spillway and may contain an office area.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Brooktrails Community Services District Brooktrails Lake Emily Dam
Brooktrails Community Services District Brooktrails Lake Emily Dam
Brooktrails Community Services District Brooktrails Rubber Spillway Dam Project