SCH Number 2006101146
Project Info
- Title
- Lake March Bypass Pipeline
- Description
- The Lake March Bypass Pipeline alignment consists of 1,024 linear feet of 16-diameter pipeline. THe pipeline will be installed utilizing traditional trenching techniques and will occur within the existing roadway. Since the 1950's , Lake March has provided non-potable water service and storage for the Riverside National Cementary and the Genera. Old Golf Course. Service to the Riverside National Cemetery, the General Olf Golf Course, and Air Force Willage West hsa been interrupted due to the limited storage capacity of Lake March and the time required by the Distirct to receive, transfer, and distribute water through it.
2 documents in project