- Stockton East Water District Conveyance Enhancement Project
- Description
- To install flow monitoring devices with 2- by 3-foot concrete footings, 20-feet high, 4.5-inch-diameter poats on the overflow areas; install 1 1/4 inch diameter steel conduits on the banks, and remove flashboards from existing weirs within the channels of Mormon Slough, Calaveras River and Moser Creek.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Stockton East Water District | Stockton East Water District Conveyance Enhancement Project | |
NOD | Stockton East Water District | Stockton East Water District Conveyance Enhancement Project | |
NEG | Stockton East Water District | Stockton East Water District Conveyance Enhancement Project |