Stockton East Water District Conveyance Enhancement Project
3 Documents in Project
Summary
SCH Number
2006032078
Lead Agency
Stockton East Water District
Document Title
Stockton East Water District Conveyance Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/24/2006
Present Land Use
Agricultural
Document Description
The Stockton East Water District Conveyance Enhancement Project (SEWDCEP) proposes to develop a Supervisory Control and Data Aquisition (SCADA) system, which will remotely monitor twelve sites in key locations within the raw water distribution system and provide off-site water gate control at three locations. The SEWDCEP includes one flow monitoring site, eleven pool level monitoring sites, the modification of existing flashboard dams with rectangular weirs to allow calculation of flow data, the retrofit of two existing flow monitoring stations to transmit data to the SCADA system; and the automation of five water control gates. It is estimated that this project will ultimately conserve up to 3,600 AFA of water.
Contact Information
Name
Kevin Kauffman
Agency Name
Stockton East Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Stockton
Counties
San Joaquin
Cross Streets
Frazier Road
Parcel #
065-090-03
Waterways
Mosher Creek and Calaveras River
Township
2N
Range
8E
Section
32
Base
MDBM
Notice of Determination
Approving Agency
Stockton East Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A