SCH Number 2006011031
Project Info
- Title
- Abatement and Removal Plan
- Description
- The project consists of the pulverization and removal of approximately 65,000 to 75,000 cubic yards of asphalt and concrete rubble mixed with loose soil. New waste management practices adopted by the California Integrated Waste Management Board in 2003 set forth permitting requirements for facilities that handle inert debris and limit such storage to six months' time. As a result of passage of these regulations, FID is required to remove the debris from the subject site. An excavator will be used onsite for crushing of the material. Additional material will be hauled in as necessary and mixed with the onsite material in order to bring the finished product into standards with Class II road grade material. FID anticipates no more than 100 trucks to visit the site per day for material removal, and a maximum of 20 trucks per day bringing supplemental material. Primary access to the project site via Nielsen Avenue. FID expects the project to be completed in two years.
2 documents in project