Abatement and Removal Plan

2 Documents in Project

Summary

SCH Number
2006011031
Lead Agency
Fresno Irrigation District
Document Title
Abatement and Removal Plan
Document Type
NOD - Notice of Determination
Received
Posted
3/1/2006
Present Land Use
Vacant Z: Light Industrial GP: Light Industrial
Document Description
The project consists of the pulverization and removal of approximately 65,000 to 75,000 cubic yards of asphalt and concrete rubble mixed with loose soil. New waste management practices adopted by the California Integrated Waste Management Board in 2003 set forth permitting requirements for facilities that handle inert debris and limit such storage to six months' time. As a result of passage of these regulations, FID is required to remove the debris from the subject site. An excavator will be used onsite for crushing of the material. Additional material will be hauled in as necessary and mixed with the onsite material in order to bring the finished product into standards with Class II road grade material. FID anticipates no more than 100 trucks to visit the site per day for material removal, and a maximum of 20 trucks per day bringing supplemental material. Primary access to the project site via Nielsen Avenue. FID expects the project to be completed in two years.

Contact Information

Name
Gary Serrato
Agency Name
Fresno Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Fresno
Counties
Fresno
Cross Streets
Marks and Nielsen Avenues
Zip
93706
Total Acres
18.1
Parcel #
326-160-27T
State Highways
99 & 180
Railways
SPRR
Airports
Fresno-Chandler
Schools
Madison ES, Addams ES, Sunset ES, B. Ramacher Devlpmt. Center
Waterways
Houghton Canal, Mortensen Canal, Teilman Canal
Township
14S
Range
19E
Section
1
Base
MDBM

Notice of Determination

Approving Agency
Fresno Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.