SCH Number 2005121101
Project Info
- Title
- Chorro Street Sewer Line Replacement
- Description
- The project involves replacing the existing sewer line running behind 129 Chorro Street that terminates at the manhole at 133 Chorro Street. The existing line was installed in 1951. A new line is proposed to be located further from the bank of Old Garden Creek. A new retaining wall would also be added for greater protection from future bank erosion and to help prevent possible sewer line exposure or breakage. Approximately 330 feet of 10 inch PVC sewer line will be laid and three new manholes will be installed. A new retaining wall will replace the existing wall to protect the new line. The new retaining wall will require a footing to be poured for the wall and will be constructed of either cinderblock or re-enforced concrete. Another method would employ a sheet pile construction wall.
2 documents in project