Chorro Street Sewer Line Replacement
2 Documents in Project
Summary
SCH Number
2005121101
Lead Agency
City of San Luis Obispo
Document Title
Chorro Street Sewer Line Replacement
Document Type
NOD - Notice of Determination
Received
Posted
2/10/2006
Present Land Use
Low-Density Residential (R-1)
Document Description
The project involves replacing the existing sewer line running behind 129 Chorro Street that terminates at the manhole at 133 Chorro Street. The existing line was installed in 1951. A new line is proposed to be located further from the bank of Old Garden Creek. A new retaining wall would also be added for greater protection from future bank erosion and to help prevent possible sewer line exposure or breakage. Approximately 330 feet of 10 inch PVC sewer line will be laid and three new manholes will be installed. A new retaining wall will replace the existing wall to protect the new line. The new retaining wall will require a footing to be poured for the wall and will be constructed of either cinderblock or re-enforced concrete. Another method would employ a sheet pile construction wall.
Contact Information
Name
Brian Leveille
Agency Name
City of San Luis Obispo
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Luis Obispo
Cross Streets
West Street
Zip
93401
Parcel #
001-014-029
State Highways
US 101, Hwy 1
Railways
SPRR
Schools
Teach Bishop's Peak, San Luis HS, Mission College Prep
Waterways
Old Garden Creek
Township
30S
Range
13E
Section
27
Base
MDB&M
Other Location Info
Los Osos, Santa Margarita, Avila Beach
Notice of Determination
Approving Agency
Community Development Director
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.