Title
Stone Creek
Description
A request for a CONDITIONAL USE PERMIT (CUP) to amend CUP No. 10-315-2 to allow for the continued mining of aggregate materials until depletion and Reclamation Plan Amendment to amend ReclamationPlan (RP) 81-0211 in order to update the reclamation plan to current Surface Mining and Reclamation Act of 1975 (SMARA) standards, current site conditions, and to reclaim the mined land in a manner that is adaptable for the anticipated end use of the site. Additionally, a request for a GENERAL PLAN AMENDMENT; COMMUNITY PLAN AMENDMENT to the Mira Mesa Community Plan to incorporate the Stone Creek Master Plan; adoption of the LAND USE PLAN, Stone Creek Master Plan; a REZONE from AR-1-1, IL-2-1, and RS-1-14 to RM-1-2, RM-2-5, RM-3-9, RM-4-10, RM-4-11, CC-5-5, IL-1-1, IL-2-1, IL-3-1, OF-1-1, OP-1-1, and OR-1-1; adoption of a COMMUNITY PLAN IMPLEMENTATION OVERLAY ZONE TYPE A (CPIOZ-A); a VESTING TENTATIVE MAP with associated easement vacations; a MASTER PLANNED DEVELOPMENT PERMIT and SITE DEVELOPMENT PERMIT to allow for redevelopment of the site as a mixed-use project and requested allowable deviations from the development regulations. The mixed-use project would include the following: up to 4,445 residential units; up to 175 hotel guest rooms; approximately 174,000 square feet of commercial retail space; approximately 200,000 square feet of commercial office space; approximately 135,000 square feet of business park space; approximately 415,000 square feet of light industrial uses; approximately 300,000 square feet of high technology uses; and site identification for the potential development of a future school. The project would also develop approximately 104.31 acres of parks and open space (which includes approximately 3.68 acres of trails, the enhanced Carroll Canyon Creek and creek corridor), developed parks, and landscaped slopes. The project would construct Carroll Canyon Road through the project site, as well as an off-site extension, establishing a portion of a main arterial; widen a portion of Camino Ruiz; complete the on-site extension of Maya Linda Road; and construct internal circulation consisting of on-site roads and parkways. The project would relocate and underground San Diego Gas and Electric (SDG&E) facilities, several easements containing smaller voltage power lines would be vacated, and power lines would be placed underground within internal streets. The approximately 293-acre project site is located north of Miramar Road, south of Mira Mesa Boulevard, east of Camino Santa Fe, and west of Black Mountain Road. The site is designated Mixed Use and identified as the CalMat Company property in the Carroll Canyon Master Plan Element area within the Mira Mesa Community Plan area. The site is zoned AR-1-1 (Agricultural Residential), IL-2-1 (Light Industrial), and RS-1-14 (Residential – Single Unit). Additionally, the site is within the Airport Land Use Compatibility Overlay Zone (Marine Corps Air Station [MCAS]Miramar), Airport Land Use Compatibility Plan (MCAS Miramar Compatibility Policy Map: Noise – 60-65 CNEL), MCAS Miramar Compatibility Policy Map – Airspace Protection – Conical Surface Airspace Protection Compatibility Area; MCAS Miramar Compatibility Policy Map: Overflight – Overflight Notification Area, Airport Influence Area (MCAS-Miramar - Review Area 1 and Review Area 2), Federal Aviation Administration (FAA) Part 77 Notification Area (MCAS Miramar), and the Transit Priority Area. (Assessor parcel number(s): 341-060-41, 341-060-42, 341-132-13, 341-190-05, 341-200-02, 341-200-03). The site is not included on any Government Code listing of hazardous waste sites.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of San Diego Stone Creek
City of San Diego Stone Creek