SCH Number 2005091054


Project Info

Title
Orchard Hills Zone 3 to 5 Booster Pump Station and Portola Springs Zone A to C Booster Pump Station
Description
The project consists of the design and construction of two pumping facilities to serve the Planning Area 1 (PA1) and Planning Area 6 (PA6) developments: a Zone 3 to 5 Domestic Water Booster Pump Station (BPS); and a Zone A to C Reclaimed Water BPS. The Zone 3 to 5 BPS would serve as a secondary supply to the new developments in PA 1. Construction would be completed and on-line by June 30, 2007 to serve the Phase 1 development in PA 1. It would be located near the Rattlesnake Reservoir site. The Zone A to C BPS is required to serve the Phase 1 development in PA 6 and would be constructed by June 30, 2007. It would be located at the same site as the Zone 3-5 BPS, near the Rattlesnake Reservoir Site.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Irvine Ranch Water District Orchard Hills Zone 3 to 5 Booster Pump Station and Portola Springs Zone A to C Booster Pump Station
Irvine Ranch Water District Orchard Hills Zone 3 to 5 Booster Pump Station and Portola Springs Zone A to C Booster Pump Station