Orchard Hills Zone 3 to 5 Booster Pump Station and Portola Springs Zone A to C Booster Pump Station
2 Documents in Project
Summary
SCH Number
2005091054
Lead Agency
Irvine Ranch Water District
Document Title
Orchard Hills Zone 3 to 5 Booster Pump Station and Portola Springs Zone A to C Booster Pump Station
Document Type
NOD - Notice of Determination
Received
Posted
10/11/2005
Present Land Use
Conservation / Open Space Reserve
Document Description
The project consists of the design and construction of two pumping facilities to serve the Planning Area 1 (PA1) and Planning Area 6 (PA6) developments: a Zone 3 to 5 Domestic Water Booster Pump Station (BPS); and a Zone A to C Reclaimed Water BPS.
The Zone 3 to 5 BPS would serve as a secondary supply to the new developments in PA 1. Construction would be completed and on-line by June 30, 2007 to serve the Phase 1 development in PA 1. It would be located near the Rattlesnake Reservoir site.
The Zone A to C BPS is required to serve the Phase 1 development in PA 6 and would be constructed by June 30, 2007. It would be located at the same site as the Zone 3-5 BPS, near the Rattlesnake Reservoir Site.
Contact Information
Name
Gregory K. Herr
Agency Name
Irvine Ranch Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Orange
Regions
Unincorporated
Cross Streets
Portola Parkway
Total Acres
1.5
State Highways
133 Eastern and 241 Foothill
Notice of Determination
Approving Agency
Board of Directors of Irvine Ranch Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.