SCH Number 2005042113
Project Info
- Title
- Coe Ranch Campground Combo Building
- Description
- - Remove six existing vault toilets (16 sf each); decommission vaults by pumping out vaults, break out concrete bottoms, fill w/gravel and cap w/clean soil; - Replace vault toilets with a new 440-sf ADA compliant 150 series unisex combination building within the general location of existing campsite #2 and within 400-feet of all the existing campsites. The exterior elevation will be board and bat wood siding and fire resistive simulated wood shingle type roof, compatible with the surrounding historical environment. The floor plan includes the three showers, three restrooms and a laundry sink; - Relocate campsite #1 between existing campsites #12 and #13; - Relocate campsite #2 approximately 50' feet Northwest of existing site; - Construct new (12' x 48') asphalt parking spur to access relocated campsite #2; - Install a new 5000 gallon septic holding tank, pump vault, force main and leach field; - Tie-in to existing water line to supply combo building; - Install new electrical power supply from existing electrical utility shed near the visitor center to the new combination building; - Modify campsites #3 and #20 to provide ADA compliant facilities including new accessible water faucet, furnishings, signage and minor grading for pathways to the new combo building.
2 documents in project