Coe Ranch Campground Combo Building

2 Documents in Project

Summary

SCH Number
2005042113
Lead Agency
California Department of Parks and Recreation
Document Title
Coe Ranch Campground Combo Building
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2005
Present Land Use
State Park (Classification); Regional Parks (Santa Clara Co. GP 1995); Agricultural Ranchlands (Santa Clara Co. Zoning).
Document Description
- Remove six existing vault toilets (16 sf each); decommission vaults by pumping out vaults, break out concrete bottoms, fill w/gravel and cap w/clean soil; - Replace vault toilets with a new 440-sf ADA compliant 150 series unisex combination building within the general location of existing campsite #2 and within 400-feet of all the existing campsites. The exterior elevation will be board and bat wood siding and fire resistive simulated wood shingle type roof, compatible with the surrounding historical environment. The floor plan includes the three showers, three restrooms and a laundry sink; - Relocate campsite #1 between existing campsites #12 and #13; - Relocate campsite #2 approximately 50' feet Northwest of existing site; - Construct new (12' x 48') asphalt parking spur to access relocated campsite #2; - Install a new 5000 gallon septic holding tank, pump vault, force main and leach field; - Tie-in to existing water line to supply combo building; - Install new electrical power supply from existing electrical utility shed near the visitor center to the new combination building; - Modify campsites #3 and #20 to provide ADA compliant facilities including new accessible water faucet, furnishings, signage and minor grading for pathways to the new combo building.

Contact Information

Name
Bill Orme
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Cities
Morgan Hill
Counties
Santa Clara
Cross Streets
Dunne Avenue / Coe Ranch Road
Waterways
Soda Springs Creek
Other Location Info
Monterey District Henry W. Coe State Park

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print