SCH Number 2005031175


Project Info

Title
Southeast Water Reliability Project (Montebello Loop)
Description
The proposed project is a local recycled water distribution system that would offset the imported potable water supplies from the State Water Project. The Project would ultimately serve 28 potential public and private entity sites along the pipeline, including one anchor customer (Montebello Golf Course) at the terminal end of the pipeline, with over 800 acre feet per year of recycled water. The project would include the installation of approximately 4.5 miles of 30-inch recycled water pipeline that would be buried within roadway in the Cities of Pico Rivera and Montebello. The starting point of the pipeline would be in the City of Pico Rivera at the intersection of San Gabriel River Parkway and Beverly Boulevard, where the proposed pipeline would connect to the existing San Gabriel River Parkway Recycled Water Pipeline Lateral. From this starting point, the pipeline would be routed west along Beverly Boulevard throughout the City of Pico Rivera and enter the City of Montebello. At the intersection of Beverly Boulevard and Rea Drive in the City of Montebello, the pipeline would be routed north along Rea Drive to Lincoln Avenue. The pipeline would then be routed west along Lincoln Avenue and end at the Montebello Golf Course. The trench excavated for the installation of the new pipeline would average eight feet in depth and four feet in width. The trench would be refilled using native backfill with an asphalt cap.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Central Basin Municipal Water District Southeast Water Reliability Project (Montebello Loop)
Central Basin Municipal Water District Southeast Water Reliability Project (Montebello Loop)