Southeast Water Reliability Project (Montebello Loop)
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2005031175
- Lead Agency
- Central Basin Municipal Water District
- Document Title
- Southeast Water Reliability Project (Montebello Loop)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/3/2005
- Present Land Use
- Project is entirely within the road rights-of-way that pass by a variety of residential, commercial, recreational, institutional, and light industrial uses. The pipeline would be constructed where various utility lines currently exist, and with adequate horizontal and vertical separation to ensure public health safety. GP: Open Space and Park, roads right-of-way Z: roads right-of-way, Open Space and Park
- Document Description
- The proposed project is a local recycled water distribution system that would offset the imported potable water supplies from the State Water Project. The Project would ultimately serve 28 potential public and private entity sites along the pipeline, including one anchor customer (Montebello Golf Course) at the terminal end of the pipeline, with over 800 acre feet per year of recycled water. The project would include the installation of approximately 4.5 miles of 30-inch recycled water pipeline that would be buried within roadway in the Cities of Pico Rivera and Montebello. The starting point of the pipeline would be in the City of Pico Rivera at the intersection of San Gabriel River Parkway and Beverly Boulevard, where the proposed pipeline would connect to the existing San Gabriel River Parkway Recycled Water Pipeline Lateral. From this starting point, the pipeline would be routed west along Beverly Boulevard throughout the City of Pico Rivera and enter the City of Montebello. At the intersection of Beverly Boulevard and Rea Drive in the City of Montebello, the pipeline would be routed north along Rea Drive to Lincoln Avenue. The pipeline would then be routed west along Lincoln Avenue and end at the Montebello Golf Course. The trench excavated for the installation of the new pipeline would average eight feet in depth and four feet in width. The trench would be refilled using native backfill with an asphalt cap.
- Contact Information
-
Uzi Daniel
Central Basin Municipal Water District
Lead/Public Agency
17140 S. Avalon Boulevard, Suite 210
Carson, CA 90746-1296
Phone : (310) 660-6245
Location
- Cities
- Montebello Pico Rivera
- Counties
- Los Angeles
- Cross Streets
- Beverly Blvd. / Rosemead Blvd. / Lincoln Ave.
- Zip
- 90660, 40
- State Highways
- 60, 19
- Railways
- UPRR
- Schools
- North Park MS, Pio Pico, La Merced and Wilcox ES, Schurr HS
- Waterways
- San Gabriel River, Rio Hondo Channel
- Township
- 2S
- Range
- 12W
- Base
- SBBM
Notice of Determination
- Approving Agency
- Board of Directors of the Central Basin Municipal Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Central Basin Municipal Water District
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.