- Title
- Uptown (also referred to as Grant Hill) Substation Project
- Description
- SDG&E is proposing to construct a new 120 MVA distribution substation to be on a 2.6 acre parcel and configured as a 120 megavolt ampere (MVA), 138/12 Kilovolt (kV), low profile design consisting of four low profile, low sound 30 MVA transformers, four sections of switchgear to accommodate sixteen 12 kV circuits, and four 12 kV metal enclosed capacitor.