- Title
- Yuba River Levee Repair Project
- Description
- To remove trees, stumps and roots at the toe of the levee and establish a 20-foot operations and maintenance (O&M) corridor, remove existing fence and install a minimum six-foot high new chain link fence with gates at the edge of the O&M corridor; demolish and remove an existing three-foot high non-engineered rock retaining wall; and relocate two power poles from the toe of the levee to just outside of the 20-foot O&M corridor.
5 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Three Rivers Levee Improvement Authority | Addendum to Yuba River Levee Repair Project Phase l and ll (2004) and Phase 4 Initial Studies/Mitigated Negative Declorations (2006) | |
NOD | Three Rivers Levee Improvement Authority | Addendum to Yuba River Levee Repair Project Phase l and ll (2004) and Phase 4 Initial Studies/Mitigated Negative Declorations (2006) | |
NOD | Three Rivers Levee Improvement Authority | Yuba River Levee Repair Project | |
NOD | Three Rivers Levee Improvement Authority | Yuba River Levee Repair Project | |
NEG | Three Rivers Levee Improvement Authority | Yuba River Levee Repair Project |