SCH Number 2004082014


Project Info

Title
Yuba River Levee Repair Project
Description
To remove trees, stumps and roots at the toe of the levee and establish a 20-foot operations and maintenance (O&M) corridor, remove existing fence and install a minimum six-foot high new chain link fence with gates at the edge of the O&M corridor; demolish and remove an existing three-foot high non-engineered rock retaining wall; and relocate two power poles from the toe of the levee to just outside of the 20-foot O&M corridor.
Download CSV New Search

 

5 documents in project

Type Lead/Public Agency Received Title
Three Rivers Levee Improvement Authority Addendum to Yuba River Levee Repair Project Phase l and ll (2004) and Phase 4 Initial Studies/Mitigated Negative Declorations (2006)
Three Rivers Levee Improvement Authority Addendum to Yuba River Levee Repair Project Phase l and ll (2004) and Phase 4 Initial Studies/Mitigated Negative Declorations (2006)
Three Rivers Levee Improvement Authority Yuba River Levee Repair Project
Three Rivers Levee Improvement Authority Yuba River Levee Repair Project
Three Rivers Levee Improvement Authority Yuba River Levee Repair Project