Addendum to Yuba River Levee Repair Project Phase l and ll (2004) and Phase 4 Initial Studies/Mitigated Negative Declorations (2006)

5 Documents in Project

Summary

SCH Number
2004082014
Lead Agency
Three Rivers Levee Improvement Authority
Document Title
Addendum to Yuba River Levee Repair Project Phase l and ll (2004) and Phase 4 Initial Studies/Mitigated Negative Declorations (2006)
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2012
Present Land Use
Open Space / Valley Agriculture
Document Description
To remove trees, stumps and roots at the toe of the levee and establish a 20-foot operations and maintenance (O&M) corridor, remove existing fence and install a minimum six-foot high new chain link fence with gates at the edge of the O&M corridor; demolish and remove an existing three-foot high non-engineered rock retaining wall; and relocate two power poles from the toe of the levee to just outside of the 20-foot O&M corridor.

Contact Information

Name
James Herota
Agency Name
Central VAlley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Cities
Marysville
Counties
Yuba
Cross Streets
SR 70, Shad Pad Road
Zip
95901
Total Acres
2
State Highways
SR 70
Railways
UPRR
Waterways
Yuba River
Section
Unsect
Other Location Info
Linda

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print