SCH Number 2004041075


Project Info

Title
Thunder Wells Waterline Project
Description
The proposed project would install a 16-inch diameter pipeline across the Salinas River to provide potable water from the Thunderbird well field to the intersection of Charolais and South River Road. Directional boring equipment would be used to install approximately 800 feet of pipeline at a minimum depth of 15 feet below the surface of the streambed. SAA #R3-2002-0851
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Paso Robles Thunderbird Water Line
City of Paso Robles Thunderbird Water Line
City of Paso Robles Thunder Wells Waterline Project