SCH Number 2004041041


Project Info

Title
Lake Calavera Reservoir Remedial Improvements
Description
Repairs to the existing Lake Calavera Reservoir intake and outlet works, spillway and access road, and outlet piping; construction of a new dam operations control building and security fencing. Repairs will require utilization of a small temporary water-tight structure with an inflatable gasket which will be placed around the upper section of the existing tower in order to pump out the water between this tower and the temporary structure for demolition and construction access. Once repaired, the normal operations of the reservoir will result in water level fluctuations between 190 and 208 feet elevation in accordance with an overall water management program.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
City of Carlsbad Lake Calavera Reservoir Remedial Improvements
City of Carlsbad Lake Calavera Reservoir Remedial Improvements
City of Carlsbad Lake Calavera Reservoir Remedial Improvements
City of Carlsbad Lake Calavera Reservoir Remedial Improvements