Lake Calavera Reservoir Remedial Improvements
4 Documents in Project
Summary
SCH Number
2004041041
Lead Agency
City of Carlsbad
Document Title
Lake Calavera Reservoir Remedial Improvements
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2006
Present Land Use
Existing reservoir and surrounded natural vegetation / Open Space (O-S) / Open Space (OS)
Document Description
Repairs to the existing Lake Calavera Reservoir intake and outlet works, spillway and access road, and outlet piping; construction of a new dam operations control building and security fencing. Repairs will require utilization of a small temporary water-tight structure with an inflatable gasket which will be placed around the upper section of the existing tower in order to pump out the water between this tower and the temporary structure for demolition and construction access. Once repaired, the normal operations of the reservoir will result in water level fluctuations between 190 and 208 feet elevation in accordance with an overall water management program.
Contact Information
Name
Michael Grim
Agency Name
City of Carlsbad
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carlsbad
Counties
San Diego
Cross Streets
Tamarack Avenue and Knollwood Drive
Total Acres
15
Parcel #
168-040-02
State Highways
Hwy 78, I-5
Railways
NCTD
Airports
McClellan / Palomar
Schools
Carlsbad Unified
Waterways
Pacific Ocean
Notice of Determination
Approving Agency
City of Carlsbad
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.