SCH Number 2004031044
Project Info
- Title
- Viejo System Project
- Description
- The Viejo System Project consists of a new substation (Viejo Substation) with 220/66 Kilovolt (kV) and 66/12 kV transformation, four 12 kV distribution lines, and one 66 kV subtranmission line, minor modifications to two existing 220 kV transmission lines, installation of one optical ground wire between Viejo and Chiquita substations, installation of an underground fiber optic cable between Viejo Substation and SCE's Irvine Operation center, and modifications at the nearby Chiquita substation (within the existing building footprint). The proposed Viejo System Project would be included in the greater Santiago System, which provides electricity to the Orange County area.
3 documents in project