Viejo System Project

3 Documents in Project

Summary

SCH Number
2004031044
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Viejo System Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
Lake Forest, Zoned Light Industrial; General Plan designated of Light Industrial. Mission Viejo: Zoned Community Facility, Business Park/Industrial, Community Facility, Light Facility, Recreation, Residential, and Roadway; General Plan Designations of Community Facility, Business Park/Industrial, Community Facility, Light Industrial, Recreation/Open Space and Residential.
Document Description
The Viejo System Project consists of a new substation (Viejo Substation) with 220/66 Kilovolt (kV) and 66/12 kV transformation, four 12 kV distribution lines, and one 66 kV subtranmission line (together, the proposed Viejo System Project). Completion of the Viejo System Project would require minor modifications to two existing 200 kV transmission lines, installation of one opitcal ground wire between Viejo and Chiquita Substation, installation of an underground fiber optic cable between Viejo Substation and SCE's Irvine Operation center, and modifications at the nerby Chiquita Substation within the existing footprint. The proposed Viejo System Project would be included in the greater Santiago System, which provides electricity to the Orange County area.

Contact Information

Name
Michael Rosauer
Agency Name
Public Utilities Commission, Energy Division
Contact Types
Lead/Public Agency

Location

Cities
Mission Viejo
Counties
Orange
Cross Streets
Approximately SR 241/El Toro to Alicia/Olympiad
Zip
Various
Total Acres
12.5
Parcel #
612-141-05 (substation only)
State Highways
SR 241
Other Location Info
Lake Forest
Other Information
Total Acres: 12.5 Plus Transmission ROW

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Caltrans, Division of Aeronautics, Department of Water Resources, Office of Historic Preservation, Resources Agency, California Department of Transportation, District 12 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 12 (DOT)
Development Types
Other (Fiber Optic Cable (mainly existing conduit)), Power:Other Power Type (Substation pus transmission line)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Social, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.