SCH Number 2003111018


Project Info

Title
Suburban Water Systems Well Replacement - Bartolo Plant 201
Description
The project is located within a United States Army Corps of Engineer flood control facility located north of the Whittier Narrows Dam. The project site has been used for pumping domestic ground water since the early 1900s. New wells will be constructed over a two-year period and will eventually replace existing wells that have lost ground water capacity. Since the project area is subject to flooding, the Army Corps of Engineer require that each well foundation be elevated 10 feet about the current flood plain level of 225 feet above mean sea level.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
City of Pico Rivera Suburban Water Systems-Whittier, New Well 201 W9
City of Pico Rivera Precise Plan of Design No. 439
City of Pico Rivera Precise Plan of Design No. 439
City of Pico Rivera Suburban Water Systems Well Replacement - Bartolo Plant 201