Suburban Water Systems-Whittier, New Well 201 W9

4 Documents in Project

Summary

SCH Number
2003111018
Lead Agency
City of Pico Rivera
Document Title
Suburban Water Systems-Whittier, New Well 201 W9
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2008
Present Land Use
Open Space/ Public facilities
Document Description
The project is located within a United States Army Corps of Engineer flood control facility located north of the Whittier Narrows Dam. The project site has been used for pumping domestic ground water since the early 1900s. New wells will be constructed over a two-year period and will eventually replace existing wells that have lost ground water capacity. Since the project area is subject to flooding, the Army Corps of Engineer require that each well foundation be elevated 10 feet about the current flood plain level of 225 feet above mean sea level.

Contact Information

Name
Paul Williams
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Pico Rivera
Counties
Los Angeles
Cross Streets
Mission Mill Road
Zip
90660
Total Acres
62.02
Parcel #
8125 012 007
State Highways
605
Railways
Union Pacific/Metrolink
Waterways
San Gabriel River
Other Location Info
Within a US Army Corp of Engineer flood control facility north of the Whittier Narrows Dam. Property of 64.7 acres but the project site is 6 acres.

Notice of Determination

Approving Agency
California Department of Public Health
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print