SCH Number 2003062147


Project Info

Title
Modesto Irrigation District (MID) Claribel/Minniear Project
Description
On August 12, 2003, a Mitigated Negative Declaration was adopted for the Claribel/Minniear Project, which involves building two substations and 5 miles of new transmission line (approximately 65 poles( on the north side of Modesto, Califronia. The Project was approved on that date and a Notice of Determination was duly filed. Since that time, MID has determined that in order to cross Hetch Hetchy lines along the approved route, two poles will have to be 15 feet taller than the maximum structure heights of 60-75 feet that were described in the initial study. The two poles will be placed adjacent to the Hetch Hetchy transmission lines, a steel lattice tower system over 110 feet in height.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Modesto Irrigation District Modesto Irrigation District (MID) Claribel/Minniear Project
Modesto Irrigation District Modesto Irrigation District (MID) Claribel/Minniear Project
Modesto Irrigation District Modesto Irrigation District (MID) Claribel/Minniear Project