SCH Number 2003061157
Project Info
- Title
- Metro Gold Line Foothill Extension: Phase 2A Additional Project Refinements
- Description
- The project, as proposed, shall involve the removal of an existing one-track system and the construction of a double track rail system to accommodate LRT lines spanning from Pasadena to Azusa. Within the 11.5 miles of the project work site DFG has regulatory authority over 5.19 acres of jurisdictional stream, of which no more than 0.82 acre of streambed vegetated with mulefat scrub and exotic nonnative species shall be temporarily impacted. Measures shall be implemented as described in the approved "Mitigation Plan for Temporary Impacts to the San Gabriel River Channel Gold Line Foothill Extension Phase II - Segment A" included as an attachment to the transmittal submitted subsequent to the notification for this Project, including measures to avoid impacts to the remaining 4.37 acres of DFG jurisdiction. No permanent impacts are expected to occur.
8 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Pasadena Metro Blue Line Construction Authority | Metro Gold Line Maintenance & Operation Facility/Foothill Extension Improvements | |
SIR | Pasadena Metro Blue Line Construction Authority | Metro Gold Line Foothill Extension: Phase 2A Additional Project Refinements | |
SIR | Pasadena Metro Blue Line Construction Authority | Metro Gold Line Maintenance & Operation Facility/Foothill Extension Improvements | |
NOP | Pasadena Metro Blue Line Construction Authority | Metro Gold Line Maintenance & Operation Facility/Foothill Extension Improvements | |
NOD | Pasadena Metro Blue Line Construction Authority | Gold Line Phase II Extension (Pasadena to Montclair) | |
FIN | Pasadena Metro Blue Line Construction Authority | Gold Line Phase II Extension (Pasadena to Montclair) | |
EIR | Pasadena Metro Blue Line Construction Authority | Gold Line Phase II Extension (Pasadena to Montclair) | |
NOP | Pasadena Metro Blue Line Construction Authority | Gold Line Phase II Extension (Pasadena to Montclair) |