SCH Number 2002111058


Project Info

Title
Euclid Street and Brookhurst Road at State Route 91
Description
The proposed project would involve improvements to the on- and off-ramps along State Route 91 at Brookhurst Road (PM 1.3) and Euclid Street (PM 2.2) The improvements are being implemented to improve traffic operations on the ramps and at the arterial intersections with the ramp termini. The improvements are not anticipated to result in significant increases in traffic volume at either of these interchanges, but rather better management of existing traffic volumes at these locations. The improvements include widening Brookhurst Road and Euclid Street within existing rights-of-ways; widening the freeway off-ramps within the existing right-of-way to provide additional left-turn storage capacities; and improving the traffic signals at the existing ramp intersections. Landscaping of each interchange area and upgrading of the existing Brookhurst drainage system will also occur.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Fullerton SR-91 at Brookhurst Road and Euclid Street
City of Fullerton Euclid Street and Brookhurst Road at State Route 91