SR-91 at Brookhurst Road and Euclid Street

2 Documents in Project

Summary

SCH Number
2002111058
Lead Agency
Fullerton, City of (City of Fullerton)
Document Title
SR-91 at Brookhurst Road and Euclid Street
Document Type
NOD - Notice of Determination
Received
Posted
12/26/2002
Present Land Use
Existing State Routh 91 on- and off-ramps/ Public Right of Way

Document Description
The proposed project would involve improvements to the on- and off-ramps along State Route 91 at Brookhurst Road (PM 1.3) and Euclid Street (PM 2.2) The improvements are being implemented to improve traffic operations on the ramps and at the arterial intersections with the ramp termini. The improvements are not anticipated to result in significant increases in traffic volume at either of these interchanges, but rather better management of existing traffic volumes at these locations. The improvements include widening Brookhurst Road and Euclid Street within existing rights-of-ways; widening the freeway off-ramps within the existing right-of-way to provide additional left-turn storage capacities; and improving the traffic signals at the existing ramp intersections. Landscaping of each interchange area and upgrading of the existing Brookhurst drainage system will also occur.

Contact Information
Yelena Voronel
City of Fullerton
303 West Commonwealth Ave
Fullerton, CA 92832

Phone : (714) 738-6852

Location

Cities
Anaheim Fullerton
Counties
Orange
Cross Streets
SR-91 at Euclid St. and Brookhurst Rd.
Zip
92801
Total Acres
<2
State Highways
SR-91, I-5
Airports
Fullerton Airport
Schools
Orangethorpe Schol
Waterways
Fullerton Creek, Carbon Creek
Township
4S
Range
10W
Section
4,5,6
Other Information
92832, 92833

Notice of Determination

Approving Agency
City of Fullerton
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Fullerton/Engineering Department 303 W. Commonwealth Ave. Fullerton, CA 92832-1775

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search