SCH Number 2002082041


Project Info

Title
Bank Stabilization at Bridge No. 36-48, Hwy 9, PM 9.3
Description
This project will involve several components, which together will result in protection of the existing bridge. These include (1) placement of rock slope protection to supplement rock placed during emergency work in the winter of 2002, (2) removal of the sand/gravel/rock bar to reestablish and redirect flows away from the southern river bank, and (3) repair of the existing sack-concrete protecting the bridge abutment.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
California Department of Transportation, District 5 Bank Stabilization at Bridge No. 36-48, Hwy 9, PM 9.3
California Department of Transportation, District 5 Bank Stabilization at Bridge No. 36-48, Hwy 9, PM 9.3
California Department of Transportation, District 5 Bank Stabilization at Bridge No. 36-48, Hwy 9, PM 9.3