SCH Number 2002062111
Project Info
- Title
- Chemically Enhanced Detention Basin Pilot Study
- Description
- The Water Quality Improvement Project consisted of the implementation of infiltration basins at fourteen sites along a two mile segment of SR 267. For fiscal reasons, the scope of the project was ultimately reduced, and seven of the sites were placed on hold until additional funding became available. These seven sites have now received funding (EA 1C9270) and design of storm water treatment BMPs for the sites is proceeding. Three of the seven sites have been selected for design as infiltration basins, as previously planned. However, the remaining four sites have been selected for design as infiltration basins, as previously planned. However, the remaining four sites have been selected for design as chemically-enhanced detention basin (CEDB) pilot sites. The CEDB pilot study portion of this project represents a change from the MND that was approved for the Brockway Summit Water Quality Improvement Project. As a result, the SND was prepared to describe and assess any potential environmental impacts of the CEDB pilot project.
5 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | California Department of Transportation, District 3 | Brockway Summit Water Quality Improvement Project | |
NEG | California Department of Transportation, District 3 | Chemically Enhanced Detention Basin Pilot Study | |
NOD | California Department of Transportation, District 3 | Brockway Summit Water Quality Improvement Project | |
FIN | California Department of Transportation, District 3 | Brockway Summit Water Quality Improvement Project | |
NEG | California Department of Transportation, District 3 | Brockway Summit Water Quality Improvement Project |