Brockway Summit Water Quality Improvement Project

5 Documents in Project

Summary

SCH Number
2002062111
Lead Agency
California Department of Transportation, District 3
Document Title
Brockway Summit Water Quality Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/1/2005
Present Land Use
State Route 267
Document Description
The Water Quality Improvement Project consisted of the implementation of infiltration basins at fourteen sites along a two mile segment of SR 267. For fiscal reasons, the scope of the project was ultimately reduced, and seven of the sites were placed on hold until additional funding became available. These seven sites have now received funding (EA 1C9270) and design of storm water treatment BMPs for the sites is proceeding. Three of the seven sites have been selected for design as infiltration basins, as previously planned. However, the remaining four sites have been selected for design as infiltration basins, as previously planned. However, the remaining four sites have been selected for design as chemically-enhanced detention basin (CEDB) pilot sites. The CEDB pilot study portion of this project represents a change from the MND that was approved for the Brockway Summit Water Quality Improvement Project. As a result, the SND was prepared to describe and assess any potential environmental impacts of the CEDB pilot project.

Contact Information

Name
Guadalupe Valdez
Agency Name
California Department of Transportation
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
Steward Way
Zip
96143
State Highways
267 and 28
Other Location Info
Kings Beach / Brockway Summit

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print