SCH Number 2002051137
Project Info
- Title
- Culver Drive Realignment (60'/40' Shifted Alignment) IS/EA
- Description
- The project proposes to widen the subject portion of Culver Drive from a two-lane undivided roadway to a four-lane divided roadway and realign it approximately 60 feet from the Village of Turtle Rock. A General Plan Amendment is required to change the designation of the roadway from a Class II (on street) to a Class I (off street) bicycle facility.
2 documents in project