SCH Number 2002032006
Project Info
- Title
- Merk Road Streambed Restoration
- Description
- SAA R3-2002-0387 Proposal will provide stabilization for an existing bridge and stream bank by installing four boulder step pool vortex weirs, and vegetated timber and redwood crib walls along the northeast side of the bank (at the bridge) and at the confluence. Project replaces pipe check dams that were installed in the 1940's and 1950's.
2 documents in project